Build a Trade Show Budget

Builds a line-item exhibit budget with the costs people forget, like drayage, electrical, rigging and lead retrieval, pulls rates from the exhibitor manual and reconciles invoices.

Example prompts

Once the skill is added, start a chat with one of these and attach your file if you have one.

  • Build a budget for a 20x20 booth at a 3-day show in Las Vegas with 6 staff. Space is $38,000.

  • Here's the exhibitor manual. Pull every service rate and deadline discount into my budget.

  • Reconcile these show invoices against my budget and explain the variances.

What this skill does

This skill builds a complete trade show budget from a few basics: booth size, space cost, staff, city and dates. It walks a full checklist of space, booth, show services, shipping, travel, lead capture, promotion and hospitality, labels every line as a quote, a rate card price or an estimate, and shows the math behind each estimate.

Give it the exhibitor manual and it extracts every service rate and order deadline, so you see what ordering early saves. After the show, it matches invoices to budget lines, catches duplicates and credits, and explains each variance in plain words.

When to use it

  • Planning a new booth or a first-time show
  • "How much will this trade show cost?"
  • Reading an exhibitor manual and service kit
  • Reconciling show invoices after the event
  • Explaining a budget overrun to finance

How it works

  1. 1IntakeAsks once for show basics, booth type, staff and travel, lead capture, and any manual, quotes or invoices you have.
  2. 2BuildLists every line from a full checklist, prices it from your quotes or the manual first, and labels the rest as estimates with the math shown.
  3. 3Sanity checkCompares your category split with a published exhibit cost breakdown and flags categories that look too low.
  4. 4DeadlinesPulls early, standard and late rates and order deadlines from the manual and lists the savings from ordering on time.
  5. 5ReconcileMatches invoices to lines, flags duplicates and credits, and writes a variance note for every line over 10% or $1,000.

What you'll need

  • Show, city, dates, booth size and type, space cost
  • Staff count, nights and travel policy
  • Optional: exhibitor manual or rate cards, quotes, invoices

What you get

A sheet-ready line-item budget with basis, quantity, unit cost, deadline and notes, a category summary against the published split, an early-rate savings list, and after the show a budget vs actual table with invoice references and variance notes. Returned as a Markdown table and CSV, or written to Google Sheets after your approval.

Tips

  • Weigh your crates before budgeting material handling; it's priced per 100 lb with minimums and surcharges.
  • Put every discount deadline from the manual in your calendar the day you book space.
  • Add rigging the moment anyone suggests a hanging sign.
  • Keep a 10% contingency line and report what you used.
  • Use the same categories every show so you can compare budgets year over year.

What's in the download

  • trade-show-budget/SKILL.md7.3 KB
  • trade-show-budget/assets/budget-template.csv938 B
  • trade-show-budget/assets/sample-budget.csv1.5 KB
  • trade-show-budget/assets/sample-invoices.csv1.7 KB
  • trade-show-budget/references/benchmarks.md1.6 KB
  • trade-show-budget/references/examples.md2.4 KB
  • trade-show-budget/references/line-items.md3.4 KB
Read the SKILL.md
---
name: trade-show-budget
description: Builds and checks trade show and conference exhibiting budgets. Creates a line-item budget across space, booth build, show services (material handling or drayage, electrical, internet, rigging, cleaning), shipping, travel, lead retrieval, promotion and hospitality, sanity-checks the split against a published cost breakdown, pulls rates and deadlines from an exhibitor manual, and reconciles invoices into budget vs actual with variance notes. Use for trade show budgets, booth cost estimates, exhibit planning or reconciling show invoices.
license: MIT
metadata:
  author: eventmarketingsoftware.com
  version: "1.0"
  category: strategy-and-budget
  source: https://eventmarketingsoftware.com/skills/trade-show-budget
---

# Trade Show Budget

Exhibit budgets usually go wrong in the same places: show services priced by weight and deadline, rigging nobody planned for, and travel that grows with every extra staffer. This skill builds a complete line-item budget, flags what's an estimate, pulls real rates from the exhibitor manual, and reconciles invoices afterwards.

Three modes. Pick from the request, or ask:

- **Build:** a new budget from show basics.
- **Manual:** extract every rate and deadline from an exhibitor manual or rate cards into the budget.
- **Reconcile:** match invoices to the budget and explain variances.

## Intake

If the user has an `event-context.md` file (standard booth, staff rates, travel policy, currency), read it first.

Ask for whatever is missing in ONE message:

1. Show name, city, dates (setup, show days, teardown), and booth size and type (inline, corner, peninsula, island).
2. Space cost, or rate per square foot or meter, and any sponsorship.
3. Booth: owned (storage and refurbishment), rented, or new build; hanging sign or not.
4. Staff count and nights; who books travel; per diem policy.
5. Lead capture plan (organizer's lead retrieval app or device, or your own tool), promotion plans, hospitality (dinner, happy hour, meeting room).
6. Exhibitor manual or rate cards, if available, and invoices for reconcile mode.
7. Currency and whether to include tax and a contingency (default 10%).

## Connectors (all optional)

- If a Google Sheets connector is available, read an existing budget or write the new one to a sheet, after a preview and a yes.
- Otherwise, accept pasted text, uploaded CSV/XLSX or PDF manuals, and return a Markdown table plus a downloadable CSV laid out like `assets/budget-template.csv`.

## Mode 1: build

```
- [ ] 1. List every line from the checklist that applies
- [ ] 2. Price lines with user numbers or manual rates first
- [ ] 3. Fill the rest as labeled estimates, with the method shown
- [ ] 4. Add contingency
- [ ] 5. Sanity-check the split
- [ ] 6. List deadlines and early-rate savings
- [ ] 7. Validate
```

1. **Lines.** Walk through every category in [references/line-items.md](references/line-items.md): space, booth and graphics, show services, shipping, travel, lead capture, promotion, hospitality, staffing extras, and contingency. Include lines that are often missed: material handling (drayage), rigging for hanging signs, electrical labor, booth cleaning, internet, storage and refurbishment, rideshare, overtime handling.
2. **Price** in this order: the user's quotes, then manual rates, then estimates. Label every line Quote, Rate card or Estimate.
3. **Estimates.** Show the arithmetic (for example "Hotel: 6 staff x 3 nights x $240 rate given by user = $4,320"). If no unit cost is available, ask, or use a starting point from the published cost split in [references/benchmarks.md](references/benchmarks.md): estimated total = space cost / space share, then each category = total x its share. Mark these "Estimate (published split, dated)" and tell the user to replace them with quotes. Never invent a unit rate.
4. **Contingency.** Default 10% of the total before contingency, as its own line.
5. **Sanity check.** Compare the budget's category shares with the published split. Flag any category far below it (show services and shipping are the usual misses), but remember the split is an industry average and dated.
6. **Deadlines.** List each discount or order deadline with the standard and late price and the saving.

## Mode 2: exhibitor manual

Read the manual or order forms and extract into a table: Service | Provider (official contractor, generic) | Unit | Early rate | Standard rate | Late or onsite rate | Deadline | Minimums and surcharges | Page. Watch for:

- Material handling priced per 100 lb (CWT) with a minimum charge, different rates for crated, uncrated and special handling, and overtime surcharges.
- Electrical priced per outlet plus labor for anything beyond outlets; island booths often need floor drops.
- Rigging: labor per hour with minimums, and a separate equipment charge.
- Internet: hardwired vs wifi pricing; shared wifi often isn't suitable for demos.
- Exclusive services you can't bring in yourself.
- Advance warehouse vs direct-to-show shipping windows.

Then update the budget lines with the right rate for the date the user will realistically order, and list early-rate savings: Service | Order by | Early price | Standard price | Saving.

Never guess a rate the manual doesn't show; write "not in manual: ask the contractor".

## Mode 3: reconcile

```
- [ ] 1. Normalize invoices (vendor, date, amount, tax, credits)
- [ ] 2. Remove duplicates; keep credits as negatives
- [ ] 3. Map each invoice line to a budget line
- [ ] 4. Budget vs actual by line and category
- [ ] 5. Explain every variance over 10% or $1,000
- [ ] 6. Lessons for next year
```

- Duplicate check: same vendor, same amount, same invoice number, or same amount within a few days. List suspected duplicates; don't silently drop them.
- Unmapped invoices go to "Unbudgeted" with a suggested line.
- Variance notes say why (late order rate, heavier freight than estimated, extra staff), using the invoice text.
- Unpaid or disputed items stay listed with status.

## Output templates

**Budget** (CSV-ready, same columns as `assets/budget-template.csv`):

Category | Line item | Basis (Quote, Rate card, Estimate) | Quantity | Unit | Unit cost | Budget | Deadline | Notes

Then a category summary: Category | Budget | Share of total | Published share | Flag

**Early-rate savings:** Service | Order by | Early price | Standard price | Saving

**Budget vs actual:** Category | Line item | Budget | Actual | Variance | Variance % | Invoice refs | Note

**Summary** (all modes): total, contingency, biggest three lines, biggest risks or variances, next deadline.

A worked example is in [references/examples.md](references/examples.md).

## Validation checklist

- [ ] Every checklist category is present or marked "not needed"
- [ ] Every line is labeled Quote, Rate card or Estimate, and estimates show their math
- [ ] Totals equal the sum of lines; category shares add to 100%
- [ ] Reconcile: invoice total in = mapped + unbudgeted + duplicates removed
- [ ] Every variance over 10% or $1,000 has a note
- [ ] Currency and tax treatment are stated

## Approval gates

Don't write to a shared sheet, submit orders, or email contractors or vendors. Show changes as a preview and wait for a yes. Default to a draft or a downloadable file.

## Related skills

event-portfolio-scorer (decide which shows to fund), event-roi-report (uses the actual cost), event-debrief (variance lessons), exhibitor-manual-deadlines (full task list from the manual).

FAQ

How much does it cost to exhibit at a trade show?
It depends on booth size, city and how much you bring, but space is usually only about a third of the total. A widely cited CEIR breakdown from 2012 put space at 36%, show services at 17%, travel at 14%, booth design at 11% and shipping at 10%. Use it as a rough check, then price lines from real quotes.
What is drayage and why is it so expensive?
Drayage, or material handling, is the fee the show's general contractor charges to move your freight from the dock to your booth and back. It's priced per 100 lb with a minimum charge, and costs more for uncrated or late freight and overtime. Weighing crates and shipping to the advance warehouse on time keeps it down.
What trade show costs do people usually forget?
The usual misses are material handling, electrical labor, rigging for hanging signs, internet for demos, booth cleaning, booth storage and refurbishment, return freight, rideshare, and extra hotel nights for setup crews. The skill walks a full checklist and asks you to mark lines as not needed rather than leaving them out.
Can it read our exhibitor manual?
Yes. Upload the manual or the order forms and it pulls each service's early, standard and late rates, order deadlines, minimums and surcharges into a table, with page references. Where the manual doesn't show a rate, it says so instead of guessing, so you know which contractor to ask.